SECTION 4 - CARRIAGE
Page 4-4
Rev B – June 2013
4.5
Install the bottom side rollers on the carriage guide frame
(FIG. 5) (not exactly as illustrated).
Figure 5. Installation of the bottom side rollers.
Looking from behind the guide rails.
NOTE:
Parts may not be exactly as shown
MATERIAL LIST PART #
1. Side roller and bracket – No longer
required
FMBUC014
2. 1/4 N.C. x 2 Allen head bolt PGAGF002
3. 1 N.C. lock nut PGAGF033
4. 1 N.C. jamb nut PGAGF026
5. 1 N.C. x 7 bolt PGAGF019
6. Upper roller MMBUC040
7. Lower side roller frame bracket FFBUC018
8. 7/16 N.C. x 5 bolt PGAGF014
9. 7/16 N.C. nylon lock nut PGAGF030