EasyManua.ls Logo

RAM CRYSTAL - Page 18

RAM CRYSTAL
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4 - CARRIAGE
Page 4-3
Rev BJune 2013
4.4
Install the upper rollers as shown in (FIG. 4). Note the 1”NC jamb nut is placed in between the two ½ thick steel plates
of the guide frame. Thread the jamb nut onto the 1x7” bolt until it has reached the end of the threads. Thread the
1”NC lock nut onto the bolt and tighten so that the jamb nut and lock nut are tight and rigid against the outside ½” steel
guide frame plate. Note the upper roller should have approximately 1/4” movement along the bolt shaft when tight.
NOTE:
Refer to shop drawings for each job for details of this
item. Parts are not exactly as shown.
MATERIAL LIST PART #
1. Carriage guide frame AFCUC001
2. Lower guide rails *NOTE
3. 1 N.C. x 7 bolt PGAGF019
4. Upper roller MMBUC040
5. 1 N.C. jamb nut PGAGF026
6. 1 N.C. lock nut PGAGF033
7. 5/8 N.C. x 3 bolt PGAGF017
8. Cable thimble
9. 5/8 N.C. nylon lock nut PGAGF032
Figure 4. Installing the carriage guide frame on to the guide rails. Looking from behind the guide rails.