25
GB
Scope of delivery retrot kit:
1 2 3
4
1 Control cable with cable gland
2 Pipe elbow
3 Hose clamp
4 Hose
Before installing the UV: > Disconnect unit from mains, before UV is ins-
talled
> remove 6 screws at unit top cover.
Installation:
Attention!
Avoid unit damage!
UV installation only with all side panels of the
unit in place.
1 Remove 2 screws at rear panel of UV.
Installation instruction
3