EasyManua.ls Logo

Raytheon Beech Baron E55 - Page 329

Raytheon Beech Baron E55
903 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RayYheon
Aircraft
Company
BARON
55
AND
58
SHOP
MANUAL
MAIN
GEAR
ASSEMBLY
NOTE:
Prior
to
assembly,
immerse
all
internal
parts
(except
felt
pad
(26))
in
hydraulic
fluid
(13,
Consumable
Materials
Chart,
Section
2)
(Ref.
Figure
9).
a.
Install
the
O-ring
(17)
and
retainer
rings
in
the
upper
bearing
(16)
of
the
cylinder
assembly
(9).
Two
dowel
rods
may
be
used
to
work
O-ring
and
retainers
into
position
(Ref.
Figure
9
and
10).
b.
Soak
the
felt
pad
(26)
in
SAE
10W30
oil
and
install
in
the
cylinder
assembly
(9)
between
the
upper
and
lower
bearings
(16
and
19).
c.
Slide
the
scraper
seal
(27)
over
the
piston
(28)
and
insert
the
lower
shock
assembly
(35)
into
the
cylinder
assembly
(9).
Work
the
scraper
seal
(27)
into
the
lower
end
of
the
cylinder
assembly
(9)
until
seated.
d.
Install
upper
torque
knee
(23)
to
the
cylinder
assembly
(9)
and
lower
torque
knee
(34)
to
the
lower
shock
assembly
(35)
using
torque
knee
pins
(21
and
31),
retaining
pins
and
cotter
pins.
Install
stop
(22)
to
the
upper
torque
knee
pin
(21).
Insert
the
center
torque
knee
bushing
(24)
and
connect
the
torque
knees
(23
and
34)
using
bolt,
washers
and
nut
(32).
e.
Lubricate
bearings
at
grease
fittings
with
grease
(8,
Consumable
Materials
Chart,
Section
2).
f.
Install
new
bushings
(12)
into
brace
(11).
Install
brace
(11)
onto
the
cylinder
assembly
(9)
with
bolt,
connector
and
nut
(10).
Install
forward
and
aft
columns
(15)to
the
brace
(1
1)
and
cylinder
assembly
(9)
using
main
landing
gear
brace
bolts
(14).
g.
Raise
and
block
lower
shock
assembly
(35)
1/4
in.
from
the
fully
compressed
position
and
fill
cylinder
assembly
I
(9)
with
hydraulic
fluid
(13,
Consumable
Materials
Chart,
Section
2)
until
the
top
of
piston
(28)
is
covered
(approximately
2
pints
of
hydraulic
fluid).
h.
Install
O-ring
(4),
valve
core
(2)
and
valve
assembly
(3)
into
orifice
tube
(6).
Assemble
the
O-ring
(7)
and
piston
ring
(8)
to
orifice
tube
and
install
into
cylinder
assembly
(9).
Slowly
extend
lower
shock
assembly
(35)
allowing
the
suction
to
pull
orifice
tube
down
into
the
cylinder
assembly
(9),
then
install
retainer
ring
(5).
WARNING:
As
with
all
operations
involving
equipment
under
high
pressure,
exercise
caution
when
performing
the
leak
test;
avoid
the
areas
directly
above
and
below
the
strut.
i.
Inflate
the
cylinder
assembly
(9)
to
approximately
100
psi
using
dry
air
or
nitrogen.
Coat
the
top
of
the
orifice
tube
(6)
and
air
valve
assembly
(3)
with
soapsuds
and
check
for
air
leaks.
j.
Release
the
air
pressure;
clean
the
soapsuds
offthe
top
of
the
orifice
tube
(6)
and
air
valve
assembly
(3)
with
fresh
water
and
wipe
dry.
k.
Install
air
valve
cap
(1)
to
air
valve
assembly.
i.
Install
all
hydraulic
plumbing,
safety
switch
components
and
clamps.
m.
Install
main
wheel
and
brake
assembly.
Refer
to
Section
5,
INSTALLING
THE
WHEEL
AND
BRAKE
ASSEMBLY.
n.
Install
main
landing
gear
to
the
airplane.
Refer
to
Section
5,
MAIN
LANDING
GEAR
INSTALLATION.
o.
Service
the
main
landing
gear.
Refer
to
Section
2,
SHOCK
STRUTS.
E22
SECTION
5
35

Table of Contents

Related product manuals