EasyManua.ls Logo

Raytheon Beech Baron E55 - Page 600

Raytheon Beech Baron E55
903 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Raytheon
Aircraft
Company
BARON
55
AND
58
SHOP
MANUAL
MAINTENANCE
LOG
Customers
are
advised
to
keep
a
complete
and
up-to-date
maintenance
log
on
each
battery.
This
information
will
help
determine
the
source
of
any
battery
problems
and
will
assist
in
substantiating
warranty
claims.
Sample
formats
for
a
service
log
land
installation
and
maintenance
check
list
are)
illustrated
on
the
following
pages.
PRE-INSTALLATION
INSTRUCTIONS
FOR
NICKEL-CADMIUM
BATTERIES
Unless
otherwise
indicated
by
a
red
warning
tag,
a
nickel-cadmium
battery
is
shipped
in
fully
discharged
state
and
contains
the
proper
amount
of
electrolyte.
Observe
the
following
precautions
to
ensure
maximum
performance
and
protect
battery
warranty:
a.
Do
not
remove
the
shorting
strap
until
prepared
to
charge
the
battery.
Batteries
from
which
the
shorting
strap
has
been
removed
(for
even
a
short
period
of
time)
must
be
considered
in
an
unknown
state
of
charge
condition
and
must
be
completely
discharged
prior
to
charging
and
installation.
b.
Inspect
batteries
shipped
from
the
factory
for
shipping
plugs
in
the
vent
holes
of
each
of
the
battery
cells.
The
blunt
aluminum
screws
that
serve
as
shipping
plugs
must
be
removed
prior
to
operation
of
the
battery.
The
Bunson
valves,
included
with
the
battery
in
a
separate
plastic
bag,
should
then
be
screwed
into
the
vent
cap
assembly
in
place
of
the
screw
plugs.
The
Bunson
valves
will
release
excessive
pressure
from
gas
accumulation
to
prevent
cell
rupture.
NOTE:
On
batteries
not
equipped
with
the
screw-type
plugs
and
Bunson
valves,
remove
the
shipping
plugs
and
clean
the
filler-cap
vent
plugs
as
noted
under
BATTERY
CLEANING.
Retighten
the
cell
vents
with
the
vent
plug
wrench
included
with
the
battery.
c.
Check
for
a
torque
of
6
ft-lbs
on
the
terminal
screws
securing
the
cross
links
connecting
the
cells
together.
d.
Before
charging,
determine
that
all
cells
are
properly
installed
by
making
a
cumulative
voltage
check.
e.
After
determining
the
battery
is
in
good
physical
condition
and
is
properly
assembled,
it
should
be
charged
as
outlined
under
BATTERY
CHARGING
and
the
electrolyte
level
adjusted.
Dec
31/03Page
2
SECTION
13

Table of Contents

Related product manuals