EasyManua.ls Logo

RD Instruments WorkHorse - Testing Your WorkHorse

RD Instruments WorkHorse
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WorkHorse Mariner ADCP User's Guide
P/N 957-6169-00 (April 2005) page 17
8 Testing Your WorkHorse
Use the following steps to test the ADCP.
a. Interconnect and apply power to the system as described in the Figure 9,
page 13.
b. Start the BBTalk program (for help on using BBTalk, see the RDI Tools
User's Guide).
c. Press <F2> and run the script file TestWH.rds. The TestWH.rds script file
runs PS0, PS3, PA, PC2, and the PC1 tests. The results of the tests will
be printed to the screen and saved to the log file WH_RSLTS.txt. The
WH_RSLTS.txt file will be created in the same directory that BBTalk is
running from.
Table 7 lists the tests BBTalk runs, gives you guidelines for running the
tests, and tells you what the results mean.
Table 5: WorkHorse ADCP Tests
Test Guidelines Results
PS0 Displays system parameters. Verify the information is
consistent with what you
know about the setup of
your system.
PA Extensive pre-deployment test that tests
the signal path and all major signal proc-
essing subsystems. This test may not
pass unless the WorkHorse transducer
face is immersed water.
All tests must pass.
PC2 Continuously updates sensor display.
Rotate and tilt WorkHorse and watch the
readings on the display change.
Satisfy yourself that the
readings make sense.
PC1 Beam continuity test. Follow instructions
to rub each beam in turn to generate a
noise signal the WorkHorse uses to verify
the transducer beam is connected and
operational.
All beams must pass.

Other manuals for RD Instruments WorkHorse

Related product manuals