EasyManua.ls Logo

RD Instruments WorkHorse - ADCP Deployment Preparation

RD Instruments WorkHorse
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WorkHorse Mariner ADCP User's Guide
page 24 RD Instruments
11.2 Prepare the ADCP for Deployment
TO J17
INPUT POWER
NAVAGATION
DEVICE
FROM
TO
ENSEMBLE-OUT
DEVICE
FROM (J22)
TO GYRO
FROM CHANNEL 1
(J20 RS-232 or J19 RS-422)
TO COMPUTER
CO
MP
U
TER
DECK BOX (REAR VIEW)
EXTERNAL RS-232 (J28)
GYROCOMPASS DATA
DC 20-60 VOLT
AC 98-264 VOLT
DC 12 VOLT
(CHOOSE ONE INPUT VOLTAGE)
(OPTIONAL)
(OPTIONAL)
(OPTIONAL)
(OPTIONAL)
(REQUIRED FOR COMMUNICATION AND TESTING)
TO COMPUTER
TO ADCP
I/O CABLE
Figure 13. Prepare the ADCP
Things to remember while preparing the ADCP.
Use the Deployment Checklist to verify that the ADCP is
ready for the deployment.
Test the ADCP using BBTalk. Some tests will fail if the
ADCP is not placed in water while the tests are being run.
Desiccant lasts a year at specified WorkHorse deployment
depths and temperatures. Remember that desiccant rapidly
absorbs moisture from normal room air. Replace the desic-
cant whenever the WorkHorse housing or end-cap is re-
moved.
Verify the compass calibration.

Other manuals for RD Instruments WorkHorse

Related product manuals