Reach PoE4N Tester Manual 1.4 08/09/2017 Page 24
B.4 Power Status and overload (IEEE 802.3af)
reset
connect on
detect ok
class 3
set 20
Enable power to port
Verify that PSE sees that device taking power.
status (verify that power is
on)
meas2 (verify that voltages
are as expected )
(Verify that PSE is providing full power)
(Verify that PSE sees overload and shuts off
power)
status (verify that power is
off)
B.5 Power Status and overload (IEEE 802.3at)
Same as above, but use “class 4”, and “set 600” for full power and “set 660” for overload
B.6 Power Status and overload (UPoE)
Same as above, but use “set 1200” for full power and “set 1320” for overload
B.7 Data transmission under power (IEEE 802.3af)
Check after commands issued
(as above for
specific test
required)
Enable power to port
Verify that PSE sees that device powers up.
status (verify that power is
on)
Run traffic test between port pairs 1 and 2, 3 and
4,…23 and 24. Verify no errors.