Cable Testing
1. Disconnect the cable under test from the line while also
disconnecting the opposite end of the cable to avoid errors as a
result of leakage from other equipment.
2. Check each conductor to ground and/or lead sheath by connecting
one of the meter's leads to ground and/or lead sheath and the other
meter lead to each of the conductors in turn.
3. Check insulation resistance between conductors by connecting
meter leads to conductors in pairs.