EasyManua.ls Logo

REMKO GPM Series User Manual

REMKO GPM Series
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Issue D – U10
REMKO GPM
Gas Wall Heater
Operation · Technology · Spare parts
Question and Answer IconNeed help?

Do you have a question about the REMKO GPM Series and is the answer not in the manual?

REMKO GPM Series Specifications

General IconGeneral
BrandREMKO
ModelGPM Series
CategoryGas Heater
LanguageEnglish

Summary

Safety notes

Unit layout

General requirements

Outlines mandatory installation and maintenance requirements for units.

Selection of the installation location

Details considerations for choosing an appropriate installation site for the unit.

Description of the unit

Function of the equipment

Explains the modulating, fan-assisted heating operation and efficiency.

Faults Fx

Reset button

Modulation

Instructions for the user

Switching on and off

Details the procedures for turning the unit on and off.

Fault displays

Describes how unit malfunctions are indicated via LEDs and fault codes.

Faults Fx

Operation with electronic temperature regulation ATR-6

Resetting the units

Operation and programming of the electronic temperature regulation ATR-6

Setting the weekly timer

Heating mode (HTG)

Explains how to select and set the heating mode on the ATR-6.

HTG - AUTO heating mode

Describes automatic operation controlled by a room thermostat.

HTG - ON heating mode

Explains continuous and manual operation of the room thermostat.

HTG - TIME (timer) heating mode

Details setting specific temperatures for specific time periods.

Programming of the HTG programming timer.

Intended use

Instructions for the installer

General information

Covers general installation guidelines, regulations, and prohibited spaces.

Installation instructions

Details minimum clearances and mounting requirements from drawings.

Standard wall installation

Pivoting wall installation

Flue gas connection

Electrical connection

Electronic temperature regulation ATR-6 connection to the control PCB

Details connecting the ATR-6 to the control PCB via bus cable.

Gas connection

Commissioning

Combustion analysis

Explains how to perform combustion analysis and check CO2 values.

Commissioning

Maintenance

Replacement of the control PCB

Replacement of the gas valve and CO2 and offset regulation

Conversion to liquid gas

Control PCB parameter table

Parameter settings of the electronic temperature regulation

Troubleshooting

Type of faults

Electrical connection diagram

Spare parts list

Technical data

Related product manuals