Installation Tools: crimping pliers for binding post and RJ45, screwdriver, manual wrench, ф 6
driller and rubber hammer.
Lifting and Handling
The unit is heavy. Do not lift it alone.
During lifting procedures ensure that the unit is firmly secured to avoid the risk of accidental
tipping or dropping.
Parts serving for support or immobilization of unit shall be designed and manufactured so as
to minimize the risk of physical injuries and of accidental loosening of fixing.
Ensure that the method of lifting will not allow the unit to slip from chains and slings or turn-
over or slide from lifting devices.
Transportation must be carried by specialized person (truck operators. Hook-up personal),
equipped with the necessary protection equipment (overalls, safe shoes, protective gloves,
helmets, goggles)
Do not walk or stand beneath or in the proximity of the load.
Avoid sudden movements and jolts when unloading and positioning the unit. Internal
handling procedures must be conducted with care. Do not exert leverage on the components
of the machine.
If the unit is not balanced apply ballast. Any protruding parts should not be supported by
hand.
The inverter should be installed so that the operating panel shall be easily accessible- easy
access to the electrical power connection point.
Accessible for maintenance and repair work.
Parts serving for support or immobilization of unit shall be designed and manufactured so as
to minimize the risk of physical injuries and accidental loosening of fixings.
Loading capacity and hardness of the supporting surface, load rating of mounting bracket
should be at least four times the weight of the devices according to IEC62109-1. And
supporting characteristics will be impaired by wear, corrosion, material fatigue or ageing,
This should be calculated by inspection of the design data of supporting material and
consulting construction engineer.