HYD 3K~6K-EPUser manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd。
- 33 -
4.6. Grid connection
The inverter is equipped with an integrated residual current monitoring unit.
When the inverter detects that the residual current exceeds
to the power grid will be quickly disconnected.
If the external ac switch has leakage protection
function, its rated leakage
action current is required to be ℃ 300mA.
Procedure:
Step1
Select the appropriate cable type and specifications according to the
table4-3.Refer to Fig.①for processing wire.
Step 2Pass the wire through the terminal, as shown in Fig.
②
Step 3
According to the mark, lock the wire into the keyhole on the terminal
and tighten it with the hexagon socket wrench, as shown in Fig.
Step4P
ush the terminal forward until the sound of "click" is heard, as shown
in Fig.⑥ .
Step 5 Connect the
connected load terminal to the inverter load port, and
the terminal forward until the sound of "click" is heard, and the terminal connection
is completed,as shown in Fig.⑦⑧.
If you need to remove the terminals from the machine, use the tool to press o
the direction indicated by the big arrow and pull the terminals out.
Need to dismantle the end connection, to use the tool, as shown in figure attending
⑩
⑪
。
Fig.4-5 Load connection
The inverter is equipped with an integrated residual current monitoring unit.
, the connection
function, its rated leakage
Select the appropriate cable type and specifications according to the
According to the mark, lock the wire into the keyhole on the terminal
.
ush the terminal forward until the sound of "click" is heard, as shown
connected load terminal to the inverter load port, and
push
the terminal forward until the sound of "click" is heard, and the terminal connection
If you need to remove the terminals from the machine, use the tool to press o
n
the direction indicated by the big arrow and pull the terminals out.
Need to dismantle the end connection, to use the tool, as shown in figure attending