Installation standards and safety compliance for cooling towers.
Procedure for assembling Single Fan RT Towers, including unloading and base setup.
Procedure for assembling Double Fan RT Towers, from unloading to securing the basin.
Procedure for assembling Quadruple Fan RT Towers, including basin and body section installation.
Preferred method for fan motor and capacity control, offering energy savings and reduced stress.
Recommended operation parameters for VFDs to ensure long life expectancy of motor and fan.
Recommended connection diagram and start-up for ABB ACH550-UH VFD.
Recommended schedule for routine tower and optional equipment maintenance tasks.
Inspection and cleaning procedures for the cooling tower basin and air inlet louvers.
Annual inspection and cleaning of the tower body, including fill, drift eliminators, and spray nozzles.
Yearly inspection of the fan and motor, with maintenance guidelines and warnings.
Inspection and maintenance procedures for the gear reducer, including oil level checks.
Maintenance procedures for the basin heater, including leak checks and connection tightness.
Addresses high exiting water temp due to flow, air, or heat load problems.
Troubleshooting for noises from fan, motor, or misalignment, and corrective actions.
Covers pump cavitation and low cold water flow due to nozzles, levels, or strainers.
Addresses leaks, excessive drift, and debris accumulation for proper water management.