TUBE C
CUT TO FIT
CABINET WIDTH
4b2
4b3
4b1
NOTE:
USE SOAPY WATER TO FACILITATE EASY
HOSE AND TUBE ASSEMBLY
4B
4b - RIGHT SIDE DRAIN OPTION
4b1 - CUT TUBE C TO FIT CORRESPONDING CABINET WIDTH.
4b2 - INSTALL TUBE C WITH HOSE CLAMP AS SHOWN TO HOSE A (PRE-INSTALLED).
4b3 - ATTACH TUBE C ASSEMBLY TO BULKHEAD COUPLING AS SHOWN.
4b4 - INSTALL HOSE CLAMP OVER HOSE ON BULKHEAD COUPLING.
HOSE A
TUBE C
NOTE:
USE SOAPY WATER TO FACILITATE EASY
HOSE AND TUBE ASSEMBLY
4A
HOSE A
4a - LEFT SIDE DRAIN OPTION
ATTACH HOSE A (PRE-INSTALLED) TO BULKHEAD COUPLING.
INSTALL HOSE CLAMP ON HOSE OVER BULK HEAD COUPLING.
3
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
INSTALL
2
OPTION DRAIN RIGHT
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD.
DRILL (2) Ø 1/8" HOLES FOR THE BULKHEAD COUPLING.
DRILL 1/8”
DRILL 1/8”
7/8” PLUG
DISCARD
OPTION DRAIN LEFT
7/8” PLUG
DISCARD
1
INSTALL INTAKE COUPLING IN TOP PLATE.
INSTALL
UPFLOW VERTICAL VENT
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
ST-A1194-28-X0
PARTS NEEDED:
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
FROM THE PARTS BAG ONLY. NO OTHER CONVERSION
KITS ARE NEEDED.
!
TUBE C
BULKHEAD
COUPLING
FROM PARTS BAG (PROVIDED WITH UNIT)
(X2)
#8 X 1/2"
SCREW
HOSE
CLAMP
INTAKE
COUPLING
W/ NUT
ELECTRIC DRILL
1/8" DRILL BIT
PLIERS
1/4" HEX HEAD DRIVER
TUBE CUTTER
TOOLS/MATERIALS NEEDED:
"*3
'-08
(X2)
(X2)
4b4