EasyManua.ls Logo

Rheem R95P - Multiventing of Direct Vent Furnaces

Rheem R95P
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66
Venting
MULTIVENTING OF DIRECT-VENT FURNACES
GENERAL VENTING REQUIREMENTS AND
GUIDELINES
Figures 33 & 34: IF VENTING OF 2 OR MORE FURNACES NEAR EACH OTHER IS REQUIRED, EACH FURNACE
MUST BE INDIVIDUALLY VENTED – NO COMMON VENTING IS PERMITTED. See Figures 33 & 34 for positioning of
the terminations. When more than two furnaces are to be vented, there must be at least 4 feet between the first two fur-
naces and the third and etc. Figure 33, (Detail A) below shows the necessary detail for the roof penetration on a standard
direct-vent vertical termination.
FIGURE 33
TWO FURNACE VENTING THROUGH ROOF
FIGURE 34
TWO FURNACE VENTING THROUGH WALL
3”/8cm
MAX.
COMBUSTION
AIR INTAKE
2” PVC
SEE DETAIL
“A”
A
SEE
8”/20cm
MIN.
12”/31cm MIN. ABOVE
GRADE OR HIGHEST
ANTICIPATED SNOW LEVEL.
CANADA: MUST CONFORM TO
CSA B149.1-10, SECT. 8.14
MINIMUM 12”/31cm IN U.S. ABOVE
AVERAGE SNOW ACCUMULATION.
MAXIMUM OF 24”/61cm ABOVE
ROOF. CANADA:
TERMINATION MUST
CONFORM TO CSA B-149.1-10, SECT. 8.14
A
SEE
*
12” (31cm) U.S.
CANADA: MUST CONFORM
TO CSA B149.1-10, SECT. 8.14
6’ (1.8m) MINIMUM
10’ (3m) RECOMMENDED
A
SEE
MINIMUM 12”/31cm
ABOVE GRADE
CANADA: TERMINATION
MUST CONFORM TO CSA
B149.1-10, SECT. 8-14
ST-A1194-18
DETAIL A
ST-A1194-21
ST-A1194-22
DETAIL A
CONCENTRIC VENTING THROUGH ROOF
CONCENTRIC VENTING THROUGH WALL
TWO PIPE VENTING THROUGH ROOF
TWO PIPE VENTING THROUGH WALL
DIRECT VENT VERTICAL TERMINATION DETAIL
*3” (8cm) minimum only if no snow accumulation is anticipated.
ST-A1194-22
2 FURNACES
Terminations must be greater than 8” apart.
Terminations must be less than 24apart or greater than
36” apart.
3rd OR MORE FURNACES
Each additional termination must be greater than 48” from
the previous termination.
A

Table of Contents

Other manuals for Rheem R95P

Related product manuals