EasyManua.ls Logo

Rheem R95P - Page 56

Rheem R95P
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56
Venting
OPTION 3: ALTERNATE HORIZONTAL TERMINATION
Figure 19 shows the alternate non-direct vent horizontal termination with minimum clearances.
NON-DIRECT VENT (cont.)
GENERAL VENTING REQUIREMENTS AND
GUIDELINES
OPTION 4: RXGY-G02 SIDE WALL
VENT TERMINATION
See Figure 20 and refer to the DIRECT VENT
Section, OPTION 8: SIDEWALL VENT KIT of
this manual for information and directions on
the side wall vent kit. The sidewall vent kit
(RXGY-G02) can be used for both direct-vent
and non-direct vent installations.
8” to 12”
FROM
WALL
60” Max.
ST-A1194-19
FIG F
12”/31cfm ABOVE GRADE
OR AVG. ANTICIPATED
SNOW LEVEL. FOR
CANADIAN INSTALLATIONS,
TERMINATIONS MUST
CONFORM TO CSA
B149.1-10, SECT. 8.14.
ST-A1194-53
MAINTAIN 12”/31cfm FOR THE U.S. AS THE
MINIMUM CLEARANCE ABOVE THE HIGHEST
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
TO CSA B149.1-10, SECT. 8.14.
FIGURE 20
TYPICAL INSTALLATION – NON-DIRECT VENTING
FIGURE 19
ALTERNATE HORIZONTAL NON-DIRECT VENT TERMINAL

Table of Contents

Other manuals for Rheem R95P

Related product manuals