EasyManua.ls Logo

Riedex DM-250 - 5 M Aintenance; Repairs; Eriodic Maintenance

Riedex DM-250
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
Open for inspection
The extraction unit is low in maintenance.
The bearings of all applied motors are lu-
bricated for life.
WARNING
Repairing the extraction unit is only permit-
ted by authorized and qualied personnel,
with sucient training/experience to per-
form maintenance and repair work.
Maintenance and repair work must be re-
gularly documented. Avoid electrostatic
charges when performing maintenance
or repair work. Use only original parts. No
changes may be made to the extraction
unit. This could have consequences for the
type approval!
NOTE
Before starting work, the machine must be
disconnected from the power supply.
NOTE
5.0 mainTenance
maIntEnancE
pErIodIc maIntEnancE
5.1
Daily:
Check the waste container level
Visual inspection for visible defects
Control compressed air via pressure
gauge (Only for DM-250/P)
Monthly*:
Check the clean side of the lter for
dust deposits. If dust is found, report
this to the supplier, perhaps a lter
leak has occurred
Checking the rubber seals of the drain
pan
*Executed by a skilled person
Continuous work:
Annually*:
Checking the screw connections and
switches
Volume ow test
Visual inspection of the compressed
air tank (only for DM-250/P)
*Executed by a skilled person
e-mail info@riedex.nl
www .riedex .nl
RIEDEX
Hoofdstraat 17
8811 HD RIED
fax 0517-269366
tel. 0517-269241
Dust extraction system
Aanzichttekening DM-350L
DM-350
3565 1280
2595
900
500
350