Installation
4.1 Notes on safety for the installation
After carefully cleaning all around the area where the train will be
installed, and arranging the correct lighting of the environment,
proceed with the installation operations.
4.2 Handling
4.3 Preliminary checks
Checking the consignment
4.4 Assembly position
The train is exclusively intended for operation in the positions
shown in Fig. 4.
4Installation
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
Train installation must be carried out by qualified
personnel, as indicated in this manual and in com-
pliance with the standards and regulations of the
laws in force.
The handling operations for the train can be highly
dangerous if not carried out with the greatest at-
tention: keep any unauthorised people at a dis-
tance; check the integrity and suitableness of the
available means of handling.
Check also that the area in which you are working
is empty and that there is an adequate escape
area (i.e. a free, safe area to which you can quick-
ly move if the train should fall).
Before proceeding with the installation operations,
carefully clean all around the area where the train
will be installed.
After removing all the packaging, check the integ-
rity of the contents. If in doubt, do not use the gas
train; contact the supplier.
The packaging elements (cardboard box, nails,
clips, plastic bags, etc.) must not be abandoned
as they are potential sources of danger and pollu-
tion; they should be collected and disposed of in
the appropriate places.
Any other position could compromise the correct
operation of the train.