EasyManua.ls Logo

Rigol DP1308A - General Inspection

Rigol DP1308A
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RIGOL Chapter 1 Test Preparations
DP1308A Performance Verification Manual
1-2
Self-test and Warm-up
Make the following preparations before performance verification:
1. Perform self-test to make sure that the instrument can work normally;
2. Warm the instrument up for at least 30 minutes.
Self-test
Connect the instrument to AC power using the power cord provided with the
accessories. Turn on the power switch at the rear panel; then press the power key
at the front panel; the instrument starts and performs self-test. If the instrument
passes the self-test, the user interface is displayed; otherwise, the self-test error
prompt message is displayed.
You can press Utility SelfTest Test to perform self-test after the
instrument starts.
If the self-test fails, make sure that the problems are found and solved and the
instrument passes the self-test before performing the performance verification test.
Warm-up
Warm the instrument up for at least 30 minutes before performing the performance
verification test.

Other manuals for Rigol DP1308A

Related product manuals