EasyManua.ls Logo

Rinnai Continuum Series - Change Over Solenoid (SV3) Check Procedure

Rinnai Continuum Series
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
REU-2532FFU Series 42 Rinnai
9) Is the change over solenoid (SV3) operating normally?
If error “11” or 71 is displayed, check the change
over solenoid (SV3).
a. # Disconnect the changeover solenoid (SV3)
connector, and measure the resistance at the
solenoid terminals.
Normal: 1.7 – 2.1 K
If normal, check b below.
Faulty: Replace the changeover solenoid (SV3).
b. Measure the voltage at the changeover solenoid
(SV3), brown – black wires.
Normal: 80 – 100 VDC
If normal, reconfirm gas pressures are correct..
Faulty: Replace the PCB unit.

Related product manuals