Installation & Servicing Instructions Rinnai E-Series
9
4 Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
Please check if the packaging is intact.
Check if all the items listed are included in the delivery.
The supply kit is contents:
Boiler with casing; Template;
Automatic air separator (inside the boiler); Installation instructions;
Wall mounting suspension bracket; User manual;
Bronze adapter ttings; Service manual;
3" PP exhaust adapters (x2); Outdoor sensor ARV12
Plumbing kit 3/4" gas shut off valve
Fixing material consisting of plugs and screws;
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
!
CAUTION

Table of Contents

Other manuals for Rinnai E110CN

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rinnai E110CN and is the answer not in the manual?

Rinnai E110CN Specifications

General IconGeneral
BrandRinnai
ModelE110CN
CategoryBoiler
LanguageEnglish

Related product manuals