Installation & Servicing Instructions Rinnai E-Series
9
4 Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
• Please check if the packaging is intact.
• Check if all the items listed are included in the delivery.
The supply kit is contents:
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
• Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Description
E75C N
E75C P
E110C N
E110C P
Boiler with:
Outdoor reset sensor ARV12 1 1
Compression ring Ø22 brass 2 2
Compression ring Ø15 brass 4 4
Cover air supply Ø120/Ø80 1 1
Gasket vent system ø80 1 1
Power cable pull safety E-Series 1 1
Screw 4,8X16mm 4 4
Nut W1.1/8x1/14 22 Compression fitting 2 2
Screw 6X60mm 3 3
Lip-ring flue pipe ø80 1 1
Feed through + plug flue gas 1 1
Cap de-aerator 1 1
Flow restriction MR01 FG 7,6L white 1
Flow restriction MR01 FG 17,5L green 1
Adapter fitting 15mm x 3/4"NPT ext. 2 2
Nut 15mm compression fitting 2 2
Flue adapter Ø80/Ø3" pps UL appr. 2 2
Wall mounting suspension bracket 1 1
Plumbing kit E-Series 1 1
3/4" Gas valve 1 1
Line voltage input connector 3 pole grey 1 1
Template 1 1
Installation & Service Instructions 1 1
User information manual 1 1
Warranty document 1 1
ICSL book 1 1
Amoun