Chapter 5 - Routine Inspection & Scheduled Maintenance
5.1 Introduction
The purpose of this chapter is to provide the operator with the routine inspection and scheduled
maintenance information required to ensure a long service life of the subject compressor. RIX
recommends documenting and tracking service history using the Service Log in the appendix of
this manual.
5.2 Routine Inspection
1. Visually inspect the system for obvious damage or leakage. Fix any issues that are found.
2. Check pressures and temperatures against normal operation.
3. Check cooling air flow. Verify cooling fans blow air over the heads.
4. Inspect for loose fittings or components. Fix any issues that are found.
5. Inspect for unusual noises or vibrations.
5.3 Scheduled Maintenance
Section
Time Interval
Operation
2000
hours
3000
hours
4000
hours
Annually
5.4
Gas Filter Service
*
5.5
Compressor Valve Service
*
5.6
Running Gear Inspection
*
5.7
Piston Ring Replacement, 1
st
Stage
*
5.7
Piston Ring Replacement, 2
nd
Stage
*
5.8
Compression Cylinder Inspection
*
5.8
Instrument Calibration
*
5.9
Connecting Rod Bearings
Inspection
*
DANGER
Before performing any maintenance, the compressor power supply
should be locked Out of Service to prevent starting which could cause
injury to personnel or damage to the equipment. Relieve all internal
pressure and allow piping to cool before repair.