EasyManua.ls Logo

Rotary SPOA10 700 Series User Manual

Default Icon
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SPOA10NB, SPOA10, SPO10, SPOA7
(500, 700, and 800 Series Lifts)
SPOA7 Capacity 7,000 lbs. (3,175 kg.)
SPOA10NB, SPOA10, SPO10 Capacity 10,000 lbs. (4,536 kg.)
Español Página 20
Le Français La page 40
I
N
S
T
A
L
L
A
T
I
O
N
I
N
S
T
R
U
C
T
I
O
N
S
© June 2019 by Vehicle Service Group. All rights reserved. CO10473
I
N
S
T
A
L
L
A
T
I
O
N
I
N
S
T
R
U
C
T
I
O
N
S
LP20314
IN20384
Rev. BE 6/11/2019
OPERATING CONDITIONS
Lift is not intended for outdoor use
and has an operating ambient temperature
range of
41°-104°F (5°-40°C)
IMPORTANT
Reference ANSI/ALI ALIS,
Safety Requirements for
Installation and Service of Automotive Lifts
before installing lift.
Question and Answer IconNeed help?

Do you have a question about the Rotary SPOA10 700 Series and is the answer not in the manual?

Rotary SPOA10 700 Series Specifications

General IconGeneral
Capacity10, 000 lbs
Drive-Thru Clearance88.625 inches
Motor2 HP
Voltage208-230V
Lifting Capacity10, 000 lbs
Load Capacity10, 000 lbs
Power Supply208-230V
WeightVaries by model

Summary

General Lift Information and Safety

Operating Conditions

Specifies the lift's intended use and ambient temperature range for safe operation.

Reference to Safety Standards

References ANSI/ALI ALIS safety requirements for lift installation and service.

Column and Overhead Assembly Steps

Lift Location and Height Requirements

Guidance on selecting lift location and ensuring adequate overhead clearance.

Column Preparation and Placement

Steps for installing column extensions, guides, brackets, and positioning columns.

Concrete and Anchoring Procedures

Seismic Lift Anchoring Requirements

Consultation requirements for seismic lift concrete and anchoring.

Non-Seismic Anchor Installation Guide

Details on drilling, anchor type, torque, and concrete strength for non-seismic lifts.

Anchoring and Overhead Mounting

Non-Seismic Anchoring Specifics

Details on shimming, torque, and concrete replacement for non-seismic anchors.

Overhead Assembly and Switch Box Mounting

Instructions for attaching the overhead assembly and switch box.

Power Unit and Hydraulic Hose Installation

Hose and Equalizer Cable Routing

Locking Latch Cable Installation

Latch Mechanism Components and Assembly

Single Phase Electrical Wiring

Single Phase Power Unit Wiring Diagram

Wiring diagram and data table for single phase power unit operation.

Electrical Safety and Wire Sizing

Guidelines for electrical supply, circuit protection, and wire sizing for the lift.

Three Phase Electrical Wiring

Three Phase Power Unit Wiring Options

Diagrams for connecting three phase power units with drum switches or push button controls.

Three Phase Control Box Installation

Hydraulic System and Lift Arm Installation

Related product manuals