EasyManua.ls Logo

Ruijie Reyee RG-EST310 - Setting up Configuration Environment

Ruijie Reyee RG-EST310
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation Guide and Reference Verifying Operating Status
14
4 Verifying Operating Status
4.1 Setting up Configuration Environment
Power on the device via 12 VDC or 24 V/0.6 A non-standard PoE power supply. Make sure all power cables are
properly connected and meet the safety requirement.
4.2 Checking Environment before/after Power-on
1. Before power-on, check the following items:
Verify that the power supply is properly connected.
Verify that the input voltage matches the specification.
2. After power-on, check the following item (Recommended):
Check the indicator status.

Other manuals for Ruijie Reyee RG-EST310

Related product manuals