Pipeline connection
a. As Figure1-3 shows, install a pressure gauge in water inlet.
b. Install valve A, valve B, valve C and valve D in inlet, outlet and
between the inlet and outlet pipeline. Valve D is a sample valve. (Or
adopt F70C bypass valve).
c. Inlet pipeline should be in parallel with outlet pipeline. Support inlet
and outlet pipeline with fixed holder.