EasyManua.ls Logo

Runxin N74A1 User Manual

Default Icon
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Multi-functional Flow Control Valve for
Water Treatment Systems
63510Old ModelN74A1
63610Old ModelN74A3
63510BOld ModelN74B1
63610BOld ModelN74B3
Instruction Manual
Please read this manual in details before using the valve
and keep it properly in order to consult in the future.
0WRX.466.510
International Patent No.WO 2006/007772
China Patent No.ZL02220153.X
ZL200420078956.5
US Patent No.7549446
India Patent No.232582
Russia Patent No.2349819
South Korea Patent No.10-0914137
Mexico Patent No.268581
Australia Patent No.2005263257
Philippine Patent No.1-2006-502553
Taiwan Patent No.M287896

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Runxin N74A1 and is the answer not in the manual?

Runxin N74A1 Specifications

General IconGeneral
BrandRunxin
ModelN74A1
CategoryControl Unit
LanguageEnglish

Summary

Product Overview and Specifications

Main Applications and System Suitability

Used for softening or demineralization water treatment systems. Be suitable for residential softening system.

Key Product Characteristics

Features hermetic sealing, corrosion resistance, manual function, long outage indicator, LED display, and buttons lock.

Operating Service Conditions

Specifies operating conditions for Runxin valve: water pressure, temperature, humidity, and inlet water quality.

Dimensional Data and Technical Parameters

Displays structural charts and technical parameters for N74A3 and F74B3 models.

Installation Procedures and Guidelines

Provides installation notices, device location guidance, and pipeline connection steps.

Setting Up and Using the Valve

PC Board Functions and Indicators

Explains PC board indicators: Time of day, buttons lock, and program mode indicators.

Parameter Setup and Specifications

Details parameters like Time of Day, Control Mode, Service Day/Hour, Regeneration Time, Resin Volume.

Valve Applications and Maintenance

Softener Operation Flow Charts

Illustrates water flow in Service, Backwash, Brine & Slow Rinse, Brine Refill, and Fast Rinse statuses.

PC Board Connectivity and Functions

Describes PC board functions: signal output, interlock, remote handling, and pressure relief connectors.

System Configuration and Flow Rate Data

Details product configuration, pressure-flow rate characteristics, and injector parameter tables.

Parameter Calculation and Settlement

Provides formulas and guidelines for setting service time, backwash, rinse, and refill parameters.

Enquiring and Modifying Parameters

Guides on inquiring and setting parameters like Time of Day, Control Mode, and Regeneration Time.

Conducting Trial Runs

Step-by-step guide for conducting trial runs after installation and parameter setting.

Troubleshooting Common Valve Issues

Lists common control valve faults, their causes, and recommended corrections.

Valve Assembly and Parts List

Provides detailed diagrams and part numbers for N74A3 (63610) valve body assembly.

Warranty Information

Related product manuals