EasyManua.ls Logo

RUTHMANN Steiger TB270 - Page 125

Default Icon
261 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Operation
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
6-11
With the left joystick two of its designated boom movements can be carried
out simultaneously. In addition to that, the third movement can be carried
out with the right joystick.
„2 movements at the same“
After shifting over onto two boom movements, with each joystick one of
those boom movements related to it can be carried out. The boom firstly
carries out that movement of the joystick, which was driven as first move-
ment out of neutral position.

Related product manuals