EasyManua.ls Logo

RUTHMANN Steiger TB270 - Page 15

Default Icon
261 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index
BA.GB.12-27409-05-07-FTA-jr
RUTHMANN-Steiger
®
TB270
III
3.3.17 Operating panel of Emergency Control .................................. 3-16
3.3.17.1 Change-over language ........................................................... 3-16
3.4 Fuses 3-17
3.4.1 Fuses carrier chassis ............................................................. 3-17
3.4.2 Fuses Ruthmann-Steiger ....................................................... 3-17
4 Operating elements and displays 4-1
4.1 Arrangement of Emergency Cut-off Push buttons 4-1
4.2 Operating elements and displays of the chassis 4-2
4.3 Operating elements and displays of the Ruthmann-
Steiger 4-2
4.3.1 Operating elements and indications on the instrument
panel in the driver’s cab ........................................................... 4-2
4.3.2 Control panel at switch box on working cage ........................... 4-3
4.3.3 Switch box (emergency control) at Steiger-substructure .......... 4-7
4.3.3.1 Operating Panel „Emergency Control“ ..................................... 4-8
4.3.3.2 Touch panel of Emergency Control .......................................... 4-9
4.3.3.3 Operational and informative messages of the plain text
indication ................................................................................ 4-12
4.3.4 Superordinate Emergency Control System ............................ 4-18
4.3.4.1 Hand pump ............................................................................ 4-18
4.3.5 Emergency control system in extreme cases ......................... 4-19
4.3.5.1 Ball cock ................................................................................ 4-20
4.3.5.2 Solenoid arresting device ....................................................... 4-20
4.3.5.3 Way valves / Solenoid valves ................................................. 4-21
4.3.5.3.1 Way valves for extension and retraction of the jacks and for
rotation of boom ..................................................................... 4-22
4.3.5.3.2 Way valves for control of boom and of working cage ............. 4-23
5 Taking into operation 5-1
5.1 Definition of transport and basic position 5-1
5.2 Measurements before starting a journey 5-3
5.3 Measurements to be taken before operating of
Ruthmann-Steiger 5-4
5.3.1 Location ................................................................................... 5-5
5.3.1.1 Securing within public road traffic ............................................. 5-5
5.3.1.2 Subsoil of stabilizing jacks ....................................................... 5-7
5.3.2 Earthing (Optional extra) .......................................................... 5-9
5.4 Preventive measurements for winter operation 5-10

Related product manuals