BA.GB.12-27409-05-07-FTA-jr
3.3.17 Operating panel of Emergency Control .................................. 3-16
3.3.17.1 Change-over language ........................................................... 3-16
3.4 Fuses 3-17
3.4.1 Fuses carrier chassis ............................................................. 3-17
3.4.2 Fuses Ruthmann-Steiger ....................................................... 3-17
4 Operating elements and displays 4-1
4.1 Arrangement of Emergency Cut-off Push buttons 4-1
4.2 Operating elements and displays of the chassis 4-2
4.3 Operating elements and displays of the Ruthmann-
Steiger 4-2
4.3.1 Operating elements and indications on the instrument
panel in the driver’s cab ........................................................... 4-2
4.3.2 Control panel at switch box on working cage ........................... 4-3
4.3.3 Switch box (emergency control) at Steiger-substructure .......... 4-7
4.3.3.1 Operating Panel „Emergency Control“ ..................................... 4-8
4.3.3.2 Touch panel of Emergency Control .......................................... 4-9
4.3.3.3 Operational and informative messages of the plain text
indication ................................................................................ 4-12
4.3.4 Superordinate Emergency Control System ............................ 4-18
4.3.4.1 Hand pump ............................................................................ 4-18
4.3.5 Emergency control system in extreme cases ......................... 4-19
4.3.5.1 Ball cock ................................................................................ 4-20
4.3.5.2 Solenoid arresting device ....................................................... 4-20
4.3.5.3 Way valves / Solenoid valves ................................................. 4-21
4.3.5.3.1 Way valves for extension and retraction of the jacks and for
rotation of boom ..................................................................... 4-22
4.3.5.3.2 Way valves for control of boom and of working cage ............. 4-23
5 Taking into operation 5-1
5.1 Definition of transport and basic position 5-1
5.2 Measurements before starting a journey 5-3
5.3 Measurements to be taken before operating of
Ruthmann-Steiger 5-4
5.3.1 Location ................................................................................... 5-5
5.3.1.1 Securing within public road traffic ............................................. 5-5
5.3.1.2 Subsoil of stabilizing jacks ....................................................... 5-7
5.3.2 Earthing (Optional extra) .......................................................... 5-9
5.4 Preventive measurements for winter operation 5-10