7 Emergency control system
(Emergency Lowering)
BA.GB.12-27409-05-07-FTA-jr
Note
First retract all the telescopes completely.
Rotate boom back into its centre position. If necessary
please lift the boom before carrying out the rotation.
Afterward lower the boom.
Should the safety cut-out be annulled through the execution of above-
mentioned movements, it is possible to take the Steiger into normal opera-
tion after having found out for which reason a safety cut-out took place. If it
is not possible to find out the reason or if faults are discovered, the opera-
tion must be stopped immediately. After having eliminated these faults, the
Steiger can be taken into operation once again.