BA.GB.12-27409-05-07-FTA-jr
9.4.5 Remarks concerning execution of inspection and maintenance
work
9.4.5.1 Lighting system
Inspection and maintenance of the lighting system of the
chassis has to be carried out in accordance with the operat-
ing and maintenance instructions of the manufacturer
Check the complete lighting system, blinker lamps, brake lamps and ro-
tating flashing beacons daily for proper function and cleanness, clean if
necessary.
Defective lights must immediately be replaced.
9.4.5.2 Complete Ruthmann-Steiger
The complete Steiger-superstructure, as e.g. base frame, stabilizing jacks,
boom, working cage, must be checked with regard to
condition and cleanness,
fissures,
deformation / damage,
varnish / painting,
corrosion,
legibility of inscription,
spaces for movement of the mechanical and hydraulic compo-
nents as well as of the power track,
fastening and locking of removable fittings,
etc.
Damage to the paintwork, as e.g. scratches or rockfall damage, must im-
mediately be repaired in order to avoid corrosion. In case of corrosion at
carrying constructional components please consult the Ruthmann-after-
sales-service.
If damage of the Ruthmann-Steiger, e.g. collision damage, etc. discernible
at damage to paintwork and bumps, a check becomes immediately be
necessary. This check must be carried out by an expert. Damage must be
rectified before the next time it is put into operation or before continuation
of operation.