8
Lawnaire
IV & V
with EST
ASSEMBLY/SET-UP INSTRUCTIONS
GENERAL NOTE: FRONT, REAR, RIGHT HAND AND LEFT HAND REFERENCES BELOW
ARE WITH RESPECT TO AN OPERATOR AT THE CONTROLS.
UNPACKING
1. Cut the banding securing the aerator to the
pallet.
2. Grab handle A and pull handle over to other side
of unit.
Banding is under tension and may snap back when
cut. Wear eye protection and stay clear when cutting
the band.
FOR LAWNAIRE V MODELS
1. Bolt the handle B in place, as shown.
2. Pull up on the transport lift handle C to raise the
aerator to the transport position.
3. Carefully roll the unit off the pallet.