7.5 Dose calibration
The vending machine is delivered with standard calibration
values set by the manufacturer.
Dose calibration can be performed by means of two
calibration levels:
remove the cover;
free the adjusting lever from the rack and put the internal
divider pulling peg into one of the 4 possible positions in
the basic coffee quantity area (7 gr - 8 gr - 9 gr - 10 gr);
move the adjusting lever into the rack and select the slot
corresponding to the dose required.
7.6 Coffee grinding calibration
Turn the ring until the required results are obtained.
After any calibration three selections are necessary before
the new setting becomes effective.
7.7 First start-up of the vending
machine
Supply the vending machine (following the instructions
given previously) and plug it into the power supply (see
section "Power Grid Connection").
At this point the message “IPERAUTOMATICA” will
appear on the display and the self-diagnosis phase is
activated to check the correct positioning of the machine
devices.
Any faults detected during the self-configuration cycle are
stored so that the vending machine can display them at the
end of the self diagnostic phase.
Carry out the grinder adjustment as indicated in the
instructions at section "Coffee Grinder Adjustment" after
refilling the water circuit.
7.8 Water circuit filling
At first VM start-up, the boiler is filled automatically.
7.8.1 Filling the boiler manually
After switching the vending machine on it is possible to fill
the boiler by activating the following procedure:
Procedure A
press the P2 key to enter the maintenance menu;
Enter the Maintenance/Washes menu and start the
automatic washing cycle;