EasyManua.ls Logo

SAJ B2-5.0-HV1 - 4. INSTRUCTIONS FOR INSTALLATION; 4.1 Unpacking and Inspection

SAJ B2-5.0-HV1
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B2 Series Battery
15
INSTRUCTIONS FOR
INSTALLATION
4.1 Unpacking and Inspection
4.1.1 Checking the Package
Although SAJ’s battery have thoroughly tested and checked before delivery, it is uncertain that the battery
may suffer damages during transportation. Please check the package for any obvious signs of damage, and if
such evidence is present, do not open the package and contact your dealer as soon as possible
4.1.2 Scope of Delivery
Please contact after sales if there are missing or damaged components.
Battery Control Unit Package
Battery control unit
M4*25 screw*6
Documents
Additional grounding cable
Side cover*2
M10*80 screw*2
M6*12 screw*2
Locking bracket*2
M4*10 screw*1
The documents include the user manual and packaging list.
4.

Related product manuals