EB 2520 EN 19
Measures for preparation
4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Checkthescopeofdelivery.Compare
the shipment received with the delivery
note.
2. Checktheshipmentfortransportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
4.1 Unpacking
Do not remove the packaging until immedi-
ately before installing the valve into the pipe-
line.
Proceed as follows to lift and install the de-
vice:
1. Remove the packaging from the device.
2. Dispose of the packaging in accordance
with the valid regulations.
4.2 Transporting and lifting
Due to the low service weight, lifting equip-
ment is not required to lift and transport the
device (e.g. to install it into the pipeline).
Risk of valve damage due to incorrectly at-
tached lifting equipment.
Do not attach lifting equipment to mounting
parts (e.g. adjusting screw or control line).
Transport instructions
− Protectthedeviceagainstexternalinu-
ences (e.g. impact).
− Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
− Protect the device against moisture and
dirt.
− Observe the permissible ambient tem-
peratures(seesection3.1).
NOTICE
!