EasyManua.ls Logo

Samsung AC BXAP G Series User Manual

Samsung AC BXAP G Series
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Air conditioner
Installation manual
AC***BXAP* G
Thank you for purchasing this Samsung air conditioner.
Before operating this unit, please read this manual carefully and retain it for future reference.
ki]_TXX]]ZhTWXptjhjGyZYGwytGv|{kvvyl|luUGGGX YWYYTW\TY^GGG㝘㤸GXXa\Za[W

Questions and Answers:

Samsung AC BXAP G Series Specifications

General IconGeneral
BrandSamsung
ModelAC BXAP G Series
CategoryAir Conditioner
LanguageEnglish

Summary

Safety Information

Power Supply, Fuse, and Circuit Breaker Safety

Highlights essential safety precautions related to the power supply line, fuses, and circuit breakers.

Installation Procedure

Step 1: Choosing the Installation Location

Guides on selecting an appropriate installation location for the outdoor and indoor units, considering environmental factors and clearances.

Step 4: Connecting Power, Communication Cables, and Controllers

Procedure for connecting the main power cable, communication cable, and controllers to the outdoor unit.

Connecting the Main Power Cable

Detailed wiring diagrams and precautions for connecting the main power cable for 1-phase and 3-phase systems.

Step 6: Connecting the Refrigerant Pipe

Provides maximum allowable lengths for refrigerant pipes based on installation type and model.

Step 9: Connecting and Removing Air from the Circuit

Procedure for connecting pipes, vacuuming the system, and purging air to prevent damage and ensure performance.

Step 10: Adding Refrigerant (R-32)

Precautions and procedures for adding R-32 refrigerant, including essential requirements for safe charging.

Step 11: Performing Gas Leak Tests

Details procedures for performing gas leak tests using nitrogen before opening valves and R-32 after opening valves.

Step 14: Checking the Earthing

Procedure for ensuring proper earthing, including selecting an electrode and connecting the earthing wire.

Step 15: Performing Final Check and Trial Operation

Covers final checks of power supply, connections, and trial operation procedures, including inverter fault indications.

Extra Procedures

Pumping Down Refrigerant

Detailed procedure for pumping down refrigerant before disconnecting pipes to prevent loss and explosion risk.

Maintenance Procedures

Performing Gas Leak Tests for Repair

Procedure for performing gas leak tests on the refrigerant circuit during repair work, emphasizing safety.

Appendix

Troubleshooting: Error Codes

Lists self-diagnostic routines and error codes displayed on the outdoor unit PCB, with meanings and remarks.