Installation Procedure
English
Installation Procedure
2 Select the insulation of the refrigerant pipe.
Insulate the gas side pipe referring to the
thickness according to the pipe size.
øʪϑϑϩ˵ɇÃʒͱͱθϩʪΧʪθɇϩЇθʪͱ˙ߩߧঔ࣍ߤߡঐ࣎ɇʒ
humidity of 85% is the standard condition. If
installing in a high humidity condition, use one
grade thicker insulation by referring to the table
below. If installing in an unfavourable conditions,
use thicker one.
Insulators heat-resistance temperature should be
ͱθʪϩ˵ɇߣߥߩঔ࣍ߢߣߡঐ࣎ࢋ
Pipe
Outer diameter
Insulation Type
(Cooling, Heating)
Remarks
General
[86°F(30°C),
85%]
High humidity
[86°F(30°C),
over 85%]
kťUđࡡĘ9ŵ
mm inch mm inch mm inch
Gas
pipe
6.35 1/4 13 1/2 19 3/4
Heating
resisting
temperature
over
248°F(120°C)
9.52~25.4 3/8~1 19 3/4 25 1
28.58~44.45
1-1/8 ~
1-3/4
19 3/4 32 1 1/4
50.8 2 25 1 38 1 1/2
When installing insulation in places and
conditions below, use the same insulation that is
used for high humidity conditions.
<Geological condition>
High humidity places such as shoreline, hot spring,
near lake or river, and ridge (when the part of the
building is covered by earth and sand.)
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
The ceiling frequently exposed to moisture and
cooling is not covered.
e.g. The pipe is installed at a corridor of a dormitory
and studio or near an exit that opens and closes
frequently.
The place where the pipe is installed is highly
humid due to the lack of ventilation system.
Step 12 Performing final check and
trial operation
1 Check the power supply between the outdoor unit and
the auxiliary circuit breaker.
1 phase power supply : L, N
2 Check the indoor unit and the ACU(AHU Control Unit)
Kit.
Check that you have connected the power and
communication cables correctly.
3 Press K1 or K2 on the outdoor unit PCB to start and
end the test modes.
Key Push type Mode
Display
SEG 1 SEG 2 SEG 3 SEG 4
K1 Short
1st
Heating test mode
࣑ࠞ
2nd
Defrost test mode
࣑ࠟ
3rd End Key operation
K2 Short
1st
Aͱͱ˝ϩʪϑϩͱʒʪ࣑ࠠ
2nd Inverter check
3rd Pump down
4th Reserved
5th
On Device Inverter
Checker (Comp#1)
࣑ࠡ
6th
Auto test mode
࣑ࠢ
7th
Auto check
࣑ࠣ
(Install
commissioning
mode)
8th End Key operation
K3 Short 1st Reset
ki]_TXYW][hTWWptjhjG|GvhhluUGGGYW YWYYTXWTZXGGG㝘㤸GXWa[_a\_