8
Installation Procedure
English
Installation Procedure
Step 2 Checking and preparing
accessories and tools
Energy Label Rubber Leg
Federal law prohibits removal of this label before consumer purchase.
U.S. Government
Heat Pump
Cooling and Heating
Split System
Samsung Electronics Co., Ltd.
Model AJ036JCJ5CH
Heating Capacity 40,000 Btu/h
Cooling Capacity 36,000 Btu/h
13.5
Most Efficient
Range of Similar Models
* Heating Seasonal Performance Factor
Least Efficient
8.2
9.0-9.5
Heating
Efficiency Rating
(HSPF)*
30.5
Most Efficient
Range of Similar Models
* Seasonal Energy Efficiency Ratio
Least Efficient
14.0
16.5-18.5
Cooling
Efficiency Rating
(SEER)*
For energy cost info, visit
productinfo.energy.gov
This system’s
efficiency ratings depend
on the coil your contractor
installs with this unit. The
heating efficiency rating
varies slightly in different
geographic regions. Ask
your contractor for details.
Installation Manual
Step 3 Fixing the outdoor unit in place
Install the outdoor unit on a rigid and stable base to prevent
disturbance from any noise caused by vibration. When
installing the unit on tall stands or in a location exposed to
strong winds, fix the unit securely to the ground or structure.
1 Position the outdoor unit so that the air flow is directed
towards the outside, as indicated by the arrows on the
top of the unit.
2 Attach the outdoor unit to the appropriate support
using anchor bolts.
3 If the outdoor unit is exposed to strong winds, install
wind baffles around the outdoor unit, so that the fan
can operate correctly.
NOTE
• Install provided rubber legs to prevent vibration and
noise.
[Unit : inch(mm)]
Anchor bolt hole
24.41(620)
37.01(940)
12.99(330)
12.91~14.17(328~360)
15.12(384)
CAUTION
• Install a drain outlet at the lowest end around the base
for outdoor unit drainage
• When installing the outdoor unit on the roof,
waterproof the unit and check the ceiling strength.
Step 4 Connecting the power cables
and communication cables
You must connect the following two electrical cables to
the outdoor unit:
• The main power cables between the auxiliary circuit
breaker and the outdoor unit.
• The communication cables between the outdoor unit
and AHU Control Unit.
CAUTION
• During installation, first make the refrigerant
connections and then the electrical connections. If the
unit is being removed, first disconnect the electrical
cables and then the refrigerant connections.
• Connect the air conditioner to ground before making
the electrical connections.
ki]_TXYW][hTWWptjhjG|GvhhluUGGG_ YWYYTXWTZXGGG㝘㤸GXWa[_a\]