EasyManua.ls Logo

Sartorius GPA3202 - Balance Installation Procedures; Model CPA2 P and CPA2 P-F Component Setup; Draft Shield Setup and Types

Sartorius GPA3202
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Model CPA2P
§ Remove the adhesive tape from the chamber doors
§ Place the components listed below inside the
chamber in the order given:
Interior draft shield
Weighing pan
Model CPA2P-F
1) Weighing filters of up to 125 mm d:
§ Lift the chamber lid gently and turn it to the
left or right
§ Place the components listed below inside
the chamber in the order given:
Interior draft shield
Filter pan
Cover the sample (filter) with the lid
or
2) Weighing with the standard weighing pan
(20 mm d):
§ Lift the chamber lid gently and turn it to the
left or right
§ Place the components listed below inside
the chamber in the order given:
Interior draft shield
Spacer ring
Weighing pan
Balances with an Analytical Draft Shield
!Check the sliding lock device on the back of the
draft shield; make sure it is in the “open" position
(to the right).
§ Position the draft shield carefully on the balance
6

Related product manuals