Screw the appropriate adapter into the underside
of the bar frame base.
Now remove the following components from
the balance:
– weighing pan
– compensating ring for BA and BP balances
– pan support for BA and BP balances
Place the frame in the weighing chamber. The
wedge-shaped opening at the top of the frame must
face the direction from which the sample holder
(sieve/glass plummet) will be placed into the frame.
Always use the metal platform to hold a beaker.
Please position this platform through the frame so it
rests evenly on the base of the weighing chamber.
If you are using an BA, BP or ME balance, turn the
platform so it rests on the pins which are far apart. For
RC and MC balances, the platform should rest
on the pins which are closer together.
9