System overview – Stage V
01:07 Issue 17 en-GB 7
Note:
The requirement for pipe length D applies only if a 90° pipe bend is connected di-
rectly downstream of the SCR unit.
Pipe sec-
tion
Description Pipe length (mm)
D Straight pipe section up-
stream of the adapter for
NO
x
sensor T115.
At least 200 mm.
D
C
399 087

Other manuals for Scania DC09

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Scania DC09 and is the answer not in the manual?

Scania DC09 Specifications

General IconGeneral
Engine ModelDC09
Displacement9.3 liters
Fuel TypeDiesel
Fuel SystemCommon rail
Bore x Stroke130 mm x 140 mm
Engine TypeInline 5-cylinder
Power Output280-360 hp
Torque Output1350-1700 Nm
Emission ControlSCR, EGR, DPF
TurbochargerVariable geometry turbocharger
Cooling SystemLiquid-cooled
Compression Ratio18:1