EasyManua.ls Logo

Scania DC13 - Page 15

Scania DC13
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
MANUAL
© Scania CV AB 2018, Sweden
Components – Stage V
01:07 Issue 17 en-GB 15
Position
The SCR unit must be installed so that the reductant doser (1) meters downwards or
to one side. See illustration.
The SCR unit reductant doser should be positioned in a space where the ventilation
is as good as possible.
IMPORTANT!
Maximum permitted ambient temperature at the reductant doser is 115°C.
On the SCR unit, there is a drain hole for emptying flush water (1). Scania recom-
mends that the SCR unit is positioned with the drain hole facing down.
1
1
1
400 178
1
399 674

Related product manuals