EasyManua.ls Logo

Schlage GF3000 - Installation Instructions Manual

Schlage GF3000
2 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
WIRING
STANDARD FEATURES
Operating Voltage
The GF3000 will operate only on filtered, regulated 12 or 24 volts DC.
Automatic voltage selection circuitry is standard.
Automatic Relock Switch (ARS)
A built-in relock switch requires the door to be in the closed position before the magnet
can be energized.
Adjustable Time Delay (ATD)
ATD provides a time delay for relock that is adjustable from 1 to 30 seconds.
The unit has been preset at the factory for a 3 second relock delay.
ADJUSTING TIME DELAY
Power must be applied for this procedure.
1.) Refer to the above “Electrical Wiring” figure and note location of ATD arrow.
2.) Remove 5/64” hex head screw to allow access to a recessed momentary
push-button switch.
3.) Using the hex (Allen) wrench, depress and release the recessed switch one time
for each second of delay required.
Example: To set ATD to 5 seconds depress the recessed switch 5 times.
NOTE: If a mistake is made, wait 10 seconds then repeat Step #3.
4.) Reinstall hex head screw, after setting desired relock delay.
Form 30501-A 07-2007
1
GF3000 CONTROL MODULE
INSTALLATION INSTRUCTIONS
IMPORTANT: DO NOT CUT
YELLOW WIRE.

Other manuals for Schlage GF3000

Related product manuals