EasyManua.ls Logo

Seagull Models CHEROKEE - Page 19

Seagull Models CHEROKEE
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
www.seagullmodels.com
1) Mark the control wire where it crosses the
servo arm hole.
Bend at the mark.
AILERON PUSHROD HORN INSTALLATION
9) Set the aileron hatch in place and use a
Phillips screw driver to install it with four wood
screws.
Mark.
Pen.
Snap keeper.
Servo arm.
3) Connect the linkage as shown and secure
the control wire with a snap keeper.
8mm
Snap keeper.
2) Make a 90-degree bend at the mark and cut
off the excess wire leaving 8mm past the bend.
M2 lock nut.
Metal clevis.
Wing.
Aileron.
M2 lock.

Related product manuals