EasyManua.ls Logo

Seagull Models CHEROKEE - Engine Mount Installation

Seagull Models CHEROKEE
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHEROKEE Instruction Manual.
8
Repeat steps to install the rudder control horn
as same as steps done for ailerons.
INSTALL RUDDER CONTROL HORN.
1 sets.
18mm.
Epoxy.
Rudder.
Rudder.
Aluminum Washer.
CONTROL HORN
M3 SCREW.
Aluminum Washer.
3x30mm.
Epoxy.
M3 LOCK NUT.
Rudder control horn.
3mm.
5.5mm.
1) Locate the items necessary to install the
engine mount included with your model. .
ENGINE MOUNT INSTALLATION.
4x30mm.
2) Use four 4x30mm head bolts and four 4mm
washers to attach the engine mount rails to
the firewall. Tighten the screws . Make sure to
use threadlock on the screws to help prevent
them from vibrating loose.

Related product manuals