EasyManua.ls Logo

SealMaster SP 300 - Operation Instruction Squeegee Sp300; Before Starting Engine; To Start Engine; To Operate Machine

SealMaster SP 300
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
OPERATION INSTRUCTION SQUEEGEE SP300
BEFORE STARTING ENGINE:
1. Follow the maintenance procedures listed in the engine manual.
2. Check the gas supply.
3. Make sure the control lever #42, located at the left of the
steering wheel, is in the neutral position. Along with the 3 levers
#H10 #H14 #H15 to the right of the steering wheel.
TO START ENGINE:
4. Position yourself in the operator’s seat.
5. Push the throttle lever #34, located at the left of the steering
wheel, 1/3 of the way.
6. COLD ENGINE: Pull choke knob #33, located on the control panel,
left of the steering wheel, all the way out and turn ignition switch
#1 If the engine does not start, repeat this procedure. Use the
choke moderately. Allow the engine to warm up before
operating.
7. WARM ENGINE: It should not be necessary to use the choke
when the engine is warm. However, this may vary with each
engine. This will require the operator to become familiar with the
unit.
TO OPERATE MACHINE:
8. To move the machine forward, push control lever #42 forward
SLOWLY until your desired speed is reached. To move the
machine in reverse, pull the control lever to neutral, completely
stopping before going into the reverse position.
NOTE: Always STOP completely, before changing directions. NEVER operate the
machine in reverse, with Rear Assembly in the DOWN position.

Table of Contents