EasyManua.ls Logo

Sedecal SHF-415 - Operating Sequences and Procedures; System Start-up Routine; X-Ray Tube Warm-up Procedure

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HF Series Generators -- RAD Console
Operation
OM- 0279R1
35
SECTION 4 OPERATING SEQUENCES
4.1 START-UP ROUTINE
System power is applied by pressing the Power On push-button on the Control
Console. The Generator will go through a start-up routine conducting an
automatic self-test that will show on the RAD kV Display information usable only
by service personnel.
After the power-up has been completed the Console should display normal
radiographic factors. If there is a malfunction, error messages will be displayed
on the RAD kV Display specifying the fault.
Some indicators on the Console are used to provide service
information during the start-up process. These indicators should
be ignored by the operator until the unit has completed its
power-up sequence.
4.2 X-RAY TUBE WARM-UP PROCEDURE
Before effecting X-ray exposures ensure that the Tube is
properly warmed-up. Make sure that no persons will be
inadvertently exposed to unnecessary X-rays during this
procedure.
Routine exposures should not be effected unless the Tube is previously
warmed-up, this prolongs X-ray Tube life.
It is recommended that the following procedure will be performed for X-ray Tube
warm-up, at the start of each day and when the Tube selected has not been in
use for approximately one hour.
This warm-up procedure is used for a typical X-ray Tube.
Consult the X-ray Tube manufacturer instructions for the
actual Tube in use, comparing its recommendations with this
procedure. If there is conflict with this procedure, comply
with the Tube manufacturers instructions.
Note .

Related product manuals