MT3401E.doc rev.0 21/05/13 Pagina 64 di 86
4.5.2) General settings
Fig. 4.5.2) General Settings screen details
In the “General Settings” it is indicated:
“Warm Up Time” the warm-up time for the system after which it passes over to
measuring mode (from 2 to 10 minutes; default 3 minutes)
“BUS Architecture” which type of the BUS-architecture for the modules was
implemented by the installer:
2 Open Buss
4 Open Buss
“Slave Address” Control panel address. If the control panel is connected to a
remote Scada system
“Maintenance Time” channel Test/Maintenance time after which a channel
automatically switches back to measuring mode (from 10 to
60 minutes; default 30 minutes)
“Buzzer Reactivation Time” reactivation time for buzzer after which the acoustic
alarm is reactivated if the alarm conditions are still
valid (from 20 to 120 minutes; default 60 minutes)