• Screw Torque: 0.8 ± 0.3kgf•cm (Screw (2))
• Screw Torque: 1.0 ± 0.3kgf•cm (Screw (3))
(OK) (NG)
NOTE
1. In case of the Gear Worm installation, check if the value
of the Fig. 2-3-B is correct.
2. When installing the wire of the Loading Motor PCB Ass'y,
install it correctly as Fig. 2-2-C.
Manual soldering conditions
• Soldering time: Within 4 seconds
• Soldering combination: Sn-3.0Ag-0.5Cu
3. In case of the Roller Cone installation, install correctly as
Fig. 2-3-D.
4. In case of the Lumirror Washer installation,
install correctly as Fig. 2-3-E.
1.8 + 0, - 0.1mm
5. In case of the Gear Roller installation, check if the value
of the Fig. 2-3-F is correct.
6. After the assembly of the Loader Sub Ass'y, hook the wire
on the Loader Sub Ass'y as shown Fig. 2-3-G.
Loader Sub Ass'y
14.3 + 0, - 0.1mm
Fig. 2-3-A
Gear Worm
Loading Motor
Safety surface for pressing of the insert.
Fig. 2-3-B
Fig. 2-3-F
Roller Sub Ass'y
Fig. 2-3-E
Fig. 2-3-G
Check Hook
Check Hook
Safety surface for
pressing of the insert.
B2-3