EasyManua.ls Logo

Sharp VL-NZ50S - Page 18

Sharp VL-NZ50S
129 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
VL-NZ50S/H/E/W/NZ80H
VL-NZ100S/H/E
8-5-3. Main chassis assembly and slide chassis assembly assembling method
(1) Enter the coupling mode. (In this position, the cam groove of the T arm operation lever in the figure is parallel to the side of the main
chassis, and the poll base is slightly moved.)
(2) Insert the slide chassis side operation pins (
1
tension arm,
2
Tu guide arm,
3
pinch lever) in the position shown below at the
main chassis side, move the slide chassis in the arrow direction, using
A
to
D
as guides, insert the loading lever operation pin
into the groove of slide chassis, and install with the 4 screws.
Item
Tightening torque
Quantity
A S Tight · M1.4 x L3 70mN·m3
F S Tight · M1.4 x L2 70mN·m5
3.
1.
4.
Item
Tightening torque
Quantity
Q
Type 2 minuteness
40mN·m3
M1.4 x L2
2.
Item
Tightening torque
Quantity
C
Special screw ·
40mN·m4
M1.4 x L1.6
Item
Tightening torque
Quantity
A S Tight · M1.4 x L3 40mN·m1
NCWø0.7-ø1.8-t0.1 1
P
Type 1 minuteness
40mN·m1
M1.4 x L1
1
A
B
D
3
2
C
C
C
C
C
313
377
355
N
P
A
Swing arm Ass'y
Reel cover Ass'y
FPC cover
Oil
Grease
(Rear surface,
groove side surface)
470
453
399
398
438
314
A
A
A
F-3
F-4
F-5
F-2
F-1
PB guide SPR.
Drum base Ass'y
Grease
(Front surface, rear surface,
groove side surface)
Tightening torque
50mN·m
Drum Installation screw
Drum fixing SPR
Drum Ass'y
Mechanism fixing angle
Q
501
500
Q
Q
H/A FPC shield plate
Head amplifier PWB unit

Related product manuals